Quartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16
Quartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16
Hero image 0 of Quartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16, 0 of 4

Quartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16

5 stars out of 2 reviews
(5.0)|
2 ratings

Key item features

  • Durable Surface: Features a Total Erase chart-style surface that resists ghosting and staining, maintaining cleanliness with minimal maintenance.
  • Magnetic Functionality: Offers magnetic quality, enabling the use of colored magnets to visually track project status.
  • Customizable Layout: Includes customizable column headings and 16 rows with 29 columns for personalized organization and clear data segmentation.
  • Moderate Use: Best suited for moderate use in environments with regular traffic, providing a reliable planning solution.
  • Integrated Accessories: Designed with a metal frame and marker tray to securely hold Quartet Prestige Connects accessories (sold separately).
  • Easy Installation: Comes with easy mounting hardware for quick and accurate wall hanging, along with one dry-erase marker.
Generated by AI
Current price is $119.09
Price when purchased online
  • Free 30-day returns

How do you want your item?

How do you want your item?
Columbus, 43215
Arrives between Feb 18 - Feb 20
|
Shipping fee $7.00
Sold and shipped by ACCO Brands Direct
4.48936170212766 stars out of 5, based on 799 seller reviews(4.5)
Report an issue with this seller
Free 30-day returns

About this item

Product details

Specifications

Warranty

Warnings

Compare with similar items

Comparison Overview:
Product

Viewing this item

Quartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16
Quartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16
current price $119.09
Quartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16
5 out of 5 Stars. 2 reviews
Quartet Arc Cubicle Whiteboard Calendar, 30" x 18", Magnetic, Aluminum Frame
Quartet Arc Cubicle Whiteboard Calendar, 30" x 18", Magnetic, Aluminum Frame
current price Now $78.30, Was $109.29
Quartet Arc Cubicle Whiteboard Calendar, 30" x 18", Magnetic, Aluminum Frame
5 out of 5 Stars. 1 reviews
MasterVision MA0392830A 1 in. x 2 in. Grid 36 in. x 24 in. Aluminum Lacquered Steel Magnetic Dry Erase Planning Board with Accessories - White/Silver
MasterVision MA0392830A 1 in. x 2 in. Grid 36 in. x 24 in. Aluminum Lacquered Steel Magnetic Dry Erase Planning Board with Accessories - White/Silver
current price Now $53.05, Was $128.70
MasterVision MA0392830A 1 in. x 2 in. Grid 36 in. x 24 in. Aluminum Lacquered Steel Magnetic Dry Erase Planning Board with Accessories - White/Silver
MasterVision GA02109830 24 in. x 36 in. In-Out Magnetic Dry Erase Board - Silver Frame
MasterVision GA02109830 24 in. x 36 in. In-Out Magnetic Dry Erase Board - Silver Frame
current price Now $57.14, Was $113.99
MasterVision GA02109830 24 in. x 36 in. In-Out Magnetic Dry Erase Board - Silver Frame
4 out of 5 Stars. 1 reviews
Quartet Prestige 2 Total Erase Monthly Calendar 36 x 24 Graphite Color Frame CP32P2
Quartet Prestige 2 Total Erase Monthly Calendar 36 x 24 Graphite Color Frame CP32P2
current price Now $129.68, Was $182.80
Quartet Prestige 2 Total Erase Monthly Calendar 36 x 24 Graphite Color Frame CP32P2
1 out of 5 Stars. 2 reviews
Tooloton Magnetic Whiteboard with Eraser and Magnets, 16" x 12", Small Hanging Dry Erase Board for Wall
Tooloton Magnetic Whiteboard with Eraser and Magnets, 16" x 12", Small Hanging Dry Erase Board for Wall
current price $26.99
Tooloton Magnetic Whiteboard with Eraser and Magnets, 16" x 12", Small Hanging Dry Erase Board for Wall
4.7 out of 5 Stars. 215 reviews
Comparison Chart:
Is magneticYQuartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16YQuartet Arc Cubicle Whiteboard Calendar, 30" x 18", Magnetic, Aluminum FrameNMasterVision MA0392830A 1 in. x 2 in. Grid 36 in. x 24 in. Aluminum Lacquered Steel Magnetic Dry Erase Planning Board with Accessories - White/SilverYMasterVision GA02109830 24 in. x 36 in. In-Out Magnetic Dry Erase Board - Silver FrameNQuartet Prestige 2 Total Erase Monthly Calendar 36 x 24 Graphite Color Frame CP32P2YTooloton Magnetic Whiteboard with Eraser and Magnets, 16" x 12", Small Hanging Dry Erase Board for Wall
MaterialPainted SteelQuartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16AluminumQuartet Arc Cubicle Whiteboard Calendar, 30" x 18", Magnetic, Aluminum FrameGold Ultra Enameled SteelMasterVision MA0392830A 1 in. x 2 in. Grid 36 in. x 24 in. Aluminum Lacquered Steel Magnetic Dry Erase Planning Board with Accessories - White/SilverLacquered SteelMasterVision GA02109830 24 in. x 36 in. In-Out Magnetic Dry Erase Board - Silver FrameSteelQuartet Prestige 2 Total Erase Monthly Calendar 36 x 24 Graphite Color Frame CP32P2AluminumTooloton Magnetic Whiteboard with Eraser and Magnets, 16" x 12", Small Hanging Dry Erase Board for Wall
Mount typeWall MountQuartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16Wall MountQuartet Arc Cubicle Whiteboard Calendar, 30" x 18", Magnetic, Aluminum FrameWall MountMasterVision MA0392830A 1 in. x 2 in. Grid 36 in. x 24 in. Aluminum Lacquered Steel Magnetic Dry Erase Planning Board with Accessories - White/SilverWall MountMasterVision GA02109830 24 in. x 36 in. In-Out Magnetic Dry Erase Board - Silver FrameWall-MountedQuartet Prestige 2 Total Erase Monthly Calendar 36 x 24 Graphite Color Frame CP32P2Wall MountTooloton Magnetic Whiteboard with Eraser and Magnets, 16" x 12", Small Hanging Dry Erase Board for Wall
Frame materialGraphite Metal FrameQuartet Prestige 2 Magnetic Total Erase Project Planner 3 x 2 Board with 16AluminumQuartet Arc Cubicle Whiteboard Calendar, 30" x 18", Magnetic, Aluminum FrameAluminumMasterVision MA0392830A 1 in. x 2 in. Grid 36 in. x 24 in. Aluminum Lacquered Steel Magnetic Dry Erase Planning Board with Accessories - White/SilverAluminumMasterVision GA02109830 24 in. x 36 in. In-Out Magnetic Dry Erase Board - Silver FrameSteelQuartet Prestige 2 Total Erase Monthly Calendar 36 x 24 Graphite Color Frame CP32P2MetalTooloton Magnetic Whiteboard with Eraser and Magnets, 16" x 12", Small Hanging Dry Erase Board for Wall
Now hiding additional rows in the Table

Customer ratings & reviews

5 out of 5 stars
stars2 ratings2 reviews
How item rating is calculated
Filtered and sorted results would be available on the new 'Customer ratings & reviews' page.
Sort by |

Showing 1-2 of 2 reviews

Jun 18, 2021
Paul N.
5 out of 5 stars review

Looks sturdy

Looks sturdy

Review from cleanitsupply.com
Helpful?2H3CDA589I4W34763659
Jun 18, 2021
Paul I.
5 out of 5 stars review

Looks sturdy

Review from cleanitsupply.com
Helpful?2H3CDA589I4W34763659